Milford-on-Sea Beach Huts

Client: New Forest District Council
Project Value: £1.2M
Location: Milford-on-sea

Won in partnership with Ramboll consulting engineers, this project replaces 119 beach huts that where damaged in winter storms. The challenging brief requires the new huts to resist a 1:200 year storm event. The design uses precast concrete and brings the promenade onto the roof of the huts, transforming the public realm. 

The ideas are very good. Milford traditions have been kept whilst bringing the sea front into the 21st century.

Milford-on-Sea resident